On this project we have installed tile flooring in the main entranceway of the customers home. The first procedure was to level out the flooring but pouring cement precisely so there were no uneven surfaces for the tile to adhere to. This project was done in Cobourg. We used regular stone concrete. Let it dry for 24 hours. Then installed the ceramic tile chosen by the customer. After the tile was laid we let it sit for 2 to 3 days for drying time. (gave extra time for drying because it was in a damp area.) Once the ceramic tile was dry we then proceeded to use sanded grout chosen again by the customer to match the color of the tile.